In an old china clay quarry, runoff from surrounding land had led to a silt build up at the bottom of the lake. Any heavy rainfall resulted in flooding. Our silt dredging removed the silt from the lake bottom to restore its full capacity.

Water Soldier Project
Parish Ponds restoration: Phase I removal of water soldier vegetation West end of Pond: choked by Water Soldier July